Article 501: Stop Further Effects First
When another person's building is demolished or altered, the actor should stop further unauthorized work. Administrators may temporarily restrict changes within necessary limits. Emergency damage prevention should target the affected area or capability, not seize unrelated items over one accidental demolition. Those involved should first explain the location, original task, and actual changes, without calling for spectators, insults, or retaliatory damage before facts are clear.
Article 502: Check Authorization, Not Just Relationships
Checks should establish whether the owner agreed, which structures they agreed to change, whether collaborators misunderstood boundaries, and how they reacted after reminders. Friendship and past authorization do not replace the scope of the present task; lack of authorization does not automatically prove entirely malicious intent either. Where the original agreement was ambiguous, assess inadequate explanation and the actor's subsequent choices separately. Conclusions must identify specific facts.
Article 503: Identify Feasible Repairs
Before repairs, ask the owner which parts they want restored. Distinguish recovery supported by available records, manual rebuilding, and returning materials. A logging plugin does not guarantee complete restoration, and mistakes must not be hidden through unauthorized restyling. If the plan affects neighboring buildings or shared projects, further confirm connections and ownership, and record actual completion.
Article 504: Explain Responsibility and Correction Separately
Promptly acknowledging mistakes and cooperating with repairs may inform the response, but does not erase actual damage. Continuing after known refusal, deliberate concealment, threats to the owner, or repeated damage require separate investigation and proportionate action. Administrators should give specific reasons for reminders, restrictions, or removal, rather than label every alteration alike or waive explanation for friends.
Article 505: Close an Incident Already Addressed
Owners and others involved may confirm what has been restored, still lacks materials, or cannot be recovered. Administrators should record necessary conclusions and correct known misinformation. Closed matters should not become entertainment through continuing humiliation. Report new conduct using new facts. Important later evidence may justify review, but review does not authorize further entry into or alteration of private buildings.